Zainab Akhtar; K. V. S. Rao · 10.1109/ictsd.2015.7095908 https://doi.org/10.1109/ictsd.2015.7095908
2015 International Conference on Technologies for Sustainable Development (ICTSD)
Solar chimney power plant
2015
2015 International Conference on Technologies for Sustainable Development (ICTSD)
no
2015-02-01 12:00:00 00003252
effect of collector efficiency on levelized electricity cost of 200 mw solar chimney power plant in india
2015
2015 International Conference on Technologies for Sustainable Development (ICTSD)
Zainab Akhtar; K. V. S. Rao
10.1109/ictsd.2015.7095908
Summary
Cost assessment of a 200 MW solar chimney power plant sited in India, estimating construction materials, capital outlay and levelized electricity cost for fifteen combinations of tower height and collector diameter. These configurations cover collector efficiencies from 33% to 65%, and the resulting capital costs and electricity costs are compared across efficiency levels.
Description written by Solar Tower. The original abstract is available from the publisher via the link below.
Open source