Cost assessment of a 200 MW solar chimney power plant sited in India, estimating construction materials, capital outlay and levelized electricity cost for fifteen combinations of tower height and collector diameter. These configurations cover collector efficiencies from 33% to 65%, and the resulting capital costs and electricity costs are compared across efficiency levels.

Description written by Solar Tower. The original abstract is available from the publisher via the link below.