A parametric study on the feasibility of solar chimney power plants in North Cyprus conditions

Okoye, Chiemeka Onyeka, and Uğur Atikol. "A parametric study on the feasibility of solar chimney power plants in North Cyprus conditions." Energy Conversion and Management 80 (2014): 178-187.
DOI: 10.1016/j.enconman.2014.01.009

BibTeX RIS

Summary

Assesses whether a solar chimney power plant would be viable in North Cyprus, using a simulation model validated against Manzanares prototype data and a cost analysis varying plant size, tower height, collector diameter and carbon prices. A 30 MW plant would yield roughly 94.5 GWh per year but only marginal economic returns (savings-to-investment ratio about 1.14), with investment cost, capacity and chimney height being decisive.

Description written by Solar Tower. The original abstract is available from the publisher via the link below.

Open source PDF (open access)